Wednesday, July 21, 2010

At What Temperature Do Pipes Burst

Destruction at all

destruction in rural areas that cause the works Llevant Train de Mallorca are in full swing. Above the station areas, leaving areas where debris and construction material and workshops of new work in Arta and Son Carrio are the areas most affected and where it looks better the environmental disaster of the pharaonic infrastructure.


The projects that were left to public exposure had no constructive detail of the restoration of the seasons or even the baseline and executive workshops Arta and Son Carrio. We do not know what impact will these new urban infrastructure projected onto agricultural land at the outskirts of both towns and rural environment.


Deforestation and land movements are significant. They have already started to build roads for reconsideration, which also consume a lot of territory. These roads, we estimate that in total over 40 miles to allow residents to cross the tracks. The Department of Transportation has not reported on the total rustic roads that will cut the train passage.


Destruction "for what?


reading the news last months you wonder why it destroys because:



Convert evil into an opportunity


To clean the railroad tracks and roads to remove the Ministry of Transportation and the Environment has swept through the territory without any pity for the trees planted and born in what is considered the new domain public although not necessary for the train to pass. However the evil done in the region of Llevant Alternative to Rail Association believes that politicians still time to relinquish Llevant train, which will be a bottomless bag of losses, because the train is less demand, and make the work carried out so far for very little effort to convert the old railroad tracks in Process Greens and the old stations in service areas. And avoid encimentar, electrifying, complete catenary steel and 30 kilometers of rural land.


The Greenways in Mallorca would be an alternative to mass tourism, desestacionalizarían the tourist season and in spring and autumn are the best times to stroll through the countryside, and revive the economy of the nuclei domestic population.


Given the economic situation and the events of the past two months by which closed railway lines in full operation, the Association Alternative to Rail believes that it is a political failure and economic ruin to continue building the train Manacor - Artà especially taking into account that has been designed without taking into account the continuity to Cala Ratjada. It is recalled that the Ministry of Transportation and Environment has not yet on public display the chosen route to Cala Ratjada and the environmental impact report.

http://www.diariodemallorca.es/part-forana/2010/05/27/sfm-propone-trazados-tren-llegue-cala-rajada-porto-cristo/573794.html

And neither He has taught as the train crosses the city of Manacor.